Tsurumi VANCS 50PN2.75S 2 Inch Submersible Water Feature Pump with 32' Power Cord
|
|
|
|
|
|
Free Ground Freight* (*Continental U.S. - Signature Required)
|
|
|
|
|
|
|
|
|
|
110Volt Single Phase (standard)
|
|
|
|
|
2 Inch Quick Disconnect Discharge Hose - 50' Long (Includes thread adapter)
|
|
|
To order with options call toll free: 1-800-882-4959 Please ask for "Internet Sales"
|
|
|
|
|
|
|
Use this pump curve to determine the flow rate of the 50PN2.75S (Series) pumps for any given elevation (head). For example if you need to pump to a height of 10 feet, this pump will move approximately 90 gallons per minute.
|
|
|
|
 |
|
 |
|
|
|
|
Applications:
Residential, commercial, industrial, effluent, wastewater and site drainage.
Chemical spill containment.
Raw water supply from rivers or lakes.
Anywhere your sump pump is subject to rust / corrosion.
|
|
|
|
|
Low internal velocities extends life of impeller and volute.
|
|
Operates at lower temperatures, Extending insulation and bearing life.
|
|
|
|
|
|
|
|
|
|
|
Dimensions Diameter x Height (inch)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50PN2.75S One piece molded cable entrance incorporates:
|
|
|
|
1. Cable Boot: Prevents kinking at cable entrance by extending handling radius 2. Anti-Wicking block: Prevents water incursions due to capillary wicking, should the power cable be damaged or the end submerged 3. Limited Tightening Plate: Prevents over tightening of boot compression screws - provides strain relief.
|
|
|
|
 |
|
|
4. Permanently lubricated, double shielded, single row, deep grove, high temperature C3 ball bearing rated, B-10 = 60,00 Hours. 5. Copper Winding with Class E Insulation
|
|
|
|
6. Pump end designed to be hydraulically correct: for a wide variety of applications
|
|
|
|
7. Built in Ball Check and Air Relief Valve: Prevents air locking 8. Semi Vortex Impeller: Handles long stringy materials and large diameter solids 9. Application Appropriate Resin and Fiberglass (FRP): Resistant to high or low temperatures, impact, chemicals, and corrosion
|
|
|
|
|
|
|
11. Stainless Steel Motor Frame, Shaft & Fasteners: Provides protection against corrosion 12. Molded in Stainless Steel Anchors for each fastener: Increases structural integrity
|
|
13. Double Inside Mechanical Seal with Silicon Carbide Faces: Assures the longest operational life of any seal available
|
|
|
|
|
14. Oil Lifter: Lubricates the seal faces down to 1/3 of normal oil level and extends seal life by ten times - uses no additional power
|
|
|
10. Circle Thermal Motor Protector: Protects against over amperage, overheating, and run-dry
|
|
|
|
|
|
|
|
|
|