Tsurumi VANCS 50PU2.4S Water Pump
Tsurumi VANCS 50PU2.4S
2 Inch Submersible Water Feature Pump
with 32' Power Cord
Free Ground Freight* (*Continental U.S. - Signature Required)
Model #
Discharge
Motor
Price
50PU2.4S
2"
110Volt
Single Phase
(standard)
$436.90
Use this pump curve to determine the flow rate of the 50PU2.4S (Series) pumps for any
given elevation (head).  For example if you need to pump to a height of 10 feet, this
pump will move approximately 65 gallons per minute.
50PU2.4S Pump Curve
Applications:

Residential, commercial,
industrial, effluent,
wastewater and site
drainage.

Chemical spill containment.

Decorative waterfalls,
fountains, and fish ponds.

Raw water supply from rivers
or lakes.

Anywhere your sump pump
is subject to rust / corrosion.
Low internal velocities
extends life of impeller
and volute.
Operates at lower
temperatures, Extending
insulation and bearing life.
Model
Solid
Handling
Capacity
Hp
Max
Head
(ft)
Max
GPM
Cable
Length
(ft)
Dimensions
Diameter x
Height (inch)
Price
2 Inch Discharge Pump
  • 50PU2.4S
1.25"
1/2
43
80
32
9.625 x
16.25
$436.90
50PU2.4S One piece molded cable entrance incorporates:
    1. Cable Boot: Prevents
    kinking at cable entrance
    by extending handling
    radius
    2. Anti-Wicking block:
    Prevents water incursions
    due to capillary wicking,
    should the power cable be
    damaged or the end
    submerged
    3. Limited Tightening
    Plate: Prevents over
    tightening of boot
    compression screws -
    provides strain relief.
Cut-Away of 50PU2.4S Pump Curve
    4. Permanently lubricated,
    double shielded, single
    row, deep grove, high
    temperature C3 ball
    bearing rated, B-10 =
    60,00 Hours.
    5. Copper Winding with
    Class E Insulation
    6. Pump end designed
    to be hydraulically
    correct: for a wide variety
    of applications
    7. Built in Ball Check
    and Air Relief Valve:  
    Prevents air locking
    8. Semi Vortex Impeller:
    Handles long stringy
    materials and large
    diameter solids
    9. Application
    Appropriate Resin and
    Fiberglass (FRP):
    Resistant to high or low
    temperatures, impact,
    chemicals, and corrosion
    11. Stainless Steel
    Motor Frame, Shaft &
    Fasteners: Provides
    protection against
    corrosion
    12. Molded in Stainless
    Steel Anchors for each
    fastener: Increases
    structural integrity
    13. Double Inside
    Mechanical Seal with
    Silicon Carbide Faces:  
    Assures the longest
    operational life of any seal
    available
    14. Oil Lifter: Lubricates
    the seal faces down to 1/3
    of normal oil level and
    extends seal life by ten
    times - uses no additional
    power
    10. Circle Thermal Motor
    Protector:  Protects
    against over amperage,
    overheating, and run-dry
Quantities limited to available stock.  Prices subject to change without website update.
Cessco and the Cessco Logo are registered trademarks.
Internet phone hours:
M-F:  8:00-4:00 Pacific
Sat & Sun: Closed
Call Toll Free:
1-800-882-4959
Please ask for internet sales
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Home / About Us /  Catalog   / Cessco Policies / Contact Us / Credit App. (Net 30 Days) / Site Map
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
CESSCO, Inc. © 2006
4222 NE Columbia Blvd.
Portland, OR 97218
503-288-1242
Call Toll Free: 1-800-882-4959
Please ask for internet sales
Thank you for choosing Cessco Inc.