HSZ2.4S Automatic Trash Pump Tsurumi HSZ2.4S Automatic
2 Inch Submersible auto Trash Pump with 20' Power Cord
Pump sands, solids and debris with
minimal wear and clogging
Tsurumi Pumps Include:  Free Ground Freight*
Single phase agitator pump suspends solids
when pumping sand and debris.
1/2 Horsepower with a 2 Inch Discharge
Can handle solids up to 3/8" diameter
Model #
Discharge
Motor
Price
HSZ2.4S
Automatic
2"
110Volt
Single Phase
(standard)
$299.00
----- Options -----
113-
D2X50PRCAM
2 Inch Quick Disconnect
Discharge Hose - 50' Long
(Includes thread adapter)
    $150.00
To order with options call toll free: 1-800-882-4959
Please ask for "Internet Sales"
Use this pump curve to determine the flow rate of the HS2.4S (Series) pumps for any
given elevation (head).  For example if you need to pump to a height of 10 feet, this
pump will move approximately 50 gallons per minute.
HSZ2.4S (Series) Trash Pump Curve
  • Pump Solids up to 3/8"
  • Built in shaft mounted agitator: Suspends solids.
  • Urathane Semi Vortex Impeller and Water
    Plates:  For maximum durability and maintaining
    pump performance.
  • Double Inside Mechanical Seal with SIC Faces:  
    Provides the longest operational life.
  • Oil Lifter:  Provides lubrication of the seal faces.
  • V-Ring Seal Protector:  Protects mechainical seal
    from abrasive particles.
  • Continuous Running Water Level: 3.5"
HSZ2.4S
Unit Specifications
Impeller
Type
Urethane Semi-Vortex
Impeller
Disc Size
2"
50mm
Max Head
39 ft
11.88m
Water
Capacity
53 gpm
200 lpm
HSZ2.4S
Electrical
Specifications
Power
1/2 Hp
0.56 kW
Phase
Single
Voltage
110V - 220 Optional
Starting
Amperage
12.5 A
Running
Amperage
5.4 A
Cable
Length
20 ft
6.1m
HSZ2.4S
Dimensions &
Weights
Pump
Diameter
10 inches
254 mm
Overall
Height
12.5
inches
317.5 mm
Operating
Weight
30 lbs.
13.6 kg
HSZ2.4S Tsurumi "Trash" Pump
for Sandy / Stringy material

    Durable trash pumps - a 1/2 Hp 2-inch discharge.  Designed to pump
    sand, solids and debris with minimal wear and clogging.  
Quantities limited to available stock.  Prices subject to change without website update.
Cessco and the Cessco Logo are registered trademarks.
Internet phone hours:
M-F:  8:00-4:00 Pacific
Sat & Sun: Closed
Call Toll Free:
1-800-882-4959
Please ask for internet sales
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Home / About Us /  Catalog   / Cessco Policies / Contact Us / Credit App. (Net 30 Days) / Site Map
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
CESSCO, Inc. © 2006
4222 NE Columbia Blvd.
Portland, OR 97218
503-288-1242
Call Toll Free: 1-800-882-4959
Please ask for internet sales
Thank you for choosing Cessco Inc.