Tsurumi LSC1.4S
Residual-Level Submersible Pump
Tsurumi Pumps Include:  Free Ground Freight*
Single phase Low-Level
Ground Drainage Pump.

2/3 Horsepower with a 3/4 Inch Discharge
Model #
Discharge
Motor
Price
LSC1.4SS
3/4"
110Volt
Single Phase
(standard)
$369.00
LSC1.4S Original Residue Level Pump drainage to 0.04 Inches
Able to pump down to the floor.  
Even the smallest puddle can be pumped dry.
Complete drainage of flat surfaces where a sump is not available.
LSC1.4S
Unit Specifications
Impeller
Type
Urethane Semi-Vortex
Impeller
Disc Size
2"
mm
Max Head
39.5 ft
m
Water
Capacity
45 gpm
lpm
LSC1.4S
Electrical
Specifications
Power
2/3 Hp
kW
Phase
Single
Voltage
110V - 220 Optional
Starting
Amperage
12.5 A
Running
Amperage
6.1 A
Cable
Length
32 ft
m
LSC1.4S
Dimensions &
Weights
Pump
Diameter
7.6875
inches
mm
Overall
Height
12.4375
inches
mm
Operating
Weight
34 lbs.
kg
LSC1.4S Pump Curve
Use this pump curve to determine the flow rate of the LSC1.4S (Series) pumps for any
given elevation (head).  For example if you need to pump to a height of 20 feet, this
pump will move approximately 30 gallons per minute.
Special Features:
  1. Prime Pump Through Discharge Outlet: For start up at any water level.
  2. Internal check Valve: Holds prime and prohibits back flow through pump when
    stopped.
  3. Urathane Semi Vortex Impeller and Water Plates:  For maximum durability and
    maintaining pump performance.
  4. Double Inside Mechanical Seal with SIC Faces:  Provides the longest
    operational life.
  5. Oil Lifter:  Provides lubrication of the seal faces.
  6. V-Ring Seal Protector:  Protects mechainical seal from abrasive particles.
Call Toll Free: 1-800-882-4959
Please ask for internet sales
Thank you for choosing Cessco Inc.
Quantities limited to available stock.  Prices subject to change without website update.
Cessco and the Cessco Logo are registered trademarks.
Internet phone hours:
M-F:  8:00-4:00 Pacific
Sat & Sun: Closed
Call Toll Free:
1-800-882-4959
Please ask for internet sales
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Home / About Us /  Catalog   / Cessco Policies / Contact Us / Credit App. (Net 30 Days) / Site Map
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
CESSCO, Inc. © 2006
4222 NE Columbia Blvd.
Portland, OR 97218
503-288-1242