Tsurumi LSR2.4S
Low-Level Submersible Pump
Tsurumi Pumps Include:  Free Ground Freight*
Single phase Low-Level
Ground Drainage Pump.

2/3 Horsepower with a 3/4 Inch Discharge
Model #
Discharge
Motor
Price
LSR2.4S
3/4"
110Volt
Single Phase
(standard)
$379.00
LSR2.4S Low-Level (abrasive resistant) Pump
Pump holds suction for drainage to 0.2 inch water level
LSR2.4S
Unit Specifications
Impeller
Type
Urethane Semi-Vortex
Impeller
Disc Size
2"
mm
Max Head
39.5 ft
m
Water
Capacity
62.4 gpm
lpm
LSR2.4S
Electrical
Specifications
Power
2/3 Hp
kW
Phase
Single
Voltage
110V - 220 Optional
Starting
Amperage
12.5 A
Running
Amperage
6.1 A
Cable
Length
32 ft
m
LSR2.4S
Dimensions &
Weights
Pump
Diameter
8.25
inches
mm
Overall
Height
11.9375
inches
mm
Operating
Weight
29 lbs.
kg
LSR2.4S (Series) Pump Curve
Use this pump curve to determine the flow rate of the LSR2.4S (Series) pumps for any
given elevation (head).  For example if you need to pump to a height of 20 feet, this
pump will move approximately 42 gallons per minute.
Special Features:
  1. Urethane, Semi Vortex Impeller and Wear Plates:  For maximum
    durability and for maintaining pump performance.
  2. Double Inside Mechanical Seal with SIC Faces:  Provides the longest
    operational life.
  3. Oil Lifter:  Provides lubrication of the seal faces.
  4. V-Ring Seal Protector:  Protects mechanical seal from abrasive particles.
Quantities limited to available stock.  Prices subject to change without website update.
Cessco and the Cessco Logo are registered trademarks.
Internet phone hours:
M-F:  8:00-4:00 Pacific
Sat & Sun: Closed
Call Toll Free:
1-800-882-4959
Please ask for internet sales
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Home / About Us /  Catalog   / Cessco Policies / Contact Us / Credit App. (Net 30 Days) / Site Map
_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
CESSCO, Inc. © 2006
4222 NE Columbia Blvd.
Portland, OR 97218
503-288-1242
Call Toll Free: 1-800-882-4959
Please ask for internet sales
Thank you for choosing Cessco Inc.